|
Frederick High School (FHS) is a four-year public high school in Frederick, MD, Frederick County, Maryland, United States. A National Blue Ribbon School of Excellence, Frederick High is the oldest school in Frederick County , the school’s diverse population reflects its surrounding dynamic community. Frederick High School opened in 1891 with girls and boys attending school in different buildings and matriculation occurring after three years. The current facility opened in 1939.〔()〕〔http://apps.fcps.org/sp.cfm?i=61〕 The school serves the city of Frederick along with Governor Thomas Johnson High School and Tuscarora High School. ==Current building and school replacement== The Board of Education has identified the modernization of older schools as a priority in the capital improvement program. A recent facility assessment study evaluated the physical condition of Frederick County Schools, as well as the ability to provide the current required curriculum. Frederick High was ranked highest in priority for high schools needing a complete renovation/modernization. The school is located at 650 Carroll Parkway in historic downtown Frederick City. It is just north of Maryland Route 144, east of U.S. 15, south of West 2nd Street, and east of West College Terrace. Frederick High School was initially constructed in 1939 with additions in 1955, 1967, 1977 and 1980. Approximately one third of the building was renovated in 1977. While a few systemic improvements have been made to the school such as roof repairs, no other significant renovations have occurred in this building in almost 35 years. The building has of space located on of land.〔(SDAT: Real Property Search )〕 In the summer of 2012 a feasibility study was begun to explore options to renovate FHS. The Board of Education unanimously voted to allow students to remain in the current 1939 building while constructing a new school on the Frederick campus. The first step in the modernization of Frederick High was to perform a feasibility study. The purpose of the feasibility study was to identify school facility renovation/modernization needs and the cost of meeting those needs. The study was completed in December 2012 and in February 2013, the Board of Education approved Option Number 5 to construct a new facility on the existing site that will be located on the existing parking lot to the west of the existing building. Students will remain in the current building while the new building is constructed. Option 5 received approval from the Designees of the Interagency Committee on School Construction in February 2011. On September 6, 2015 ground was officially broken on the new school. Final site work, including the stadium renovation, will begin in spring 2017 and will be followed by abatement/demolition of the old school in summer/fall 2017. The new school is set to be open for students in fall 2017 with total projection completion by summer 2018. The district says the new Frederick High will have a capacity for 1,826 students. The building has been designed to meet at least LEED silver standards for environmentally friendly operations. The new Frederick High will cost more than $114 million, according to numbers released by FCPS in late April 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Frederick High School」の詳細全文を読む スポンサード リンク
|